O'Hare Modernization

> O'Hare Modernization > Circulation Enhancements
> Arrestor Bed Installation > Superstructure Replacement

In early 2003, The Chicago Department of Aviation retained the Bowman, Barrett & Associates led team of BPC Airport Partners to perform Master Civil Engineering services for the O'Hare Modernization Program.

Today, we are excited to report the following construction progress:

North Airfield Projects:

  • North Airfield Traffic Control Tower
  • North Detention Basin Pump Station and Spillway
  • JAWA 90-inch Water Main Relocation
  • Runway 9L-27R Paving, Lighting & Signing
  • Runway 9L-27R NAVAIDS
  • LLWAS Expansion and Relocation
  • Relocation of Mount Prospect Rd. and Guard Post 1
  • North Perimeter Road and Security Fencing
  • Displaced Threshold Runway 14L

South Airfield Projects:

  • Runway 10L-28R Extension and Taxiway Paving/Electrical
  • Runway 10L Mass Grading, Central Basin and Pump Station
  • Runway 10L NAVAIDS
  • Runway 10C-28C Mass Grading (E) South Basin and Pump Station
  • Airfield Vaults and Associated Duct Banks
  • South Basin Site Preparation and Taxiway “Kelo”
  • Interim Bensenville Ditch
  • Interim Union Pacific Railroad Relocation and Cargo Access Road

The completion phase is now underway.

Runway 9L-22R is the first new runway built at O'Hare since 1971, when Runway 4R-27L was designed by our own founder, Lou Bowman.